01 / Pre-Construction
Pre-Construction Services.
Working alongside the architect from schematic design onward. We price the design as it evolves, flag the trade-level implications of geometry decisions, identify long-lead items early, and surface code or constructibility issues before drawings get to bid. The owner sees the cost trajectory in real time rather than at bid.
02 / Owner's-Rep
Owner's Representative.
An advisory-only engagement. The owner contracts directly with a separate GC; we sit on the owner's side of the table. Review pay applications, change orders, schedule slippage, sub performance. Walk the site weekly. Translate construction-speak into decisions the owner needs to make.
03 / CM-at-Risk
CM-at-Risk with GMP.
We hold the contract risk under a guaranteed-maximum-price (GMP) arrangement. The owner sees open-book cost accounting; if we come in under GMP, savings are split per the contract terms. If we go over, we eat it. The structure aligns our incentives with the owner's — tight scope discipline, no padded change orders.
04 / When To Pick Which
Owner's-Rep vs. CM-at-Risk.
If you've already chosen a GC and want a second set of construction-savvy eyes on the project, owner's-rep. If you want construction expertise on the team from day one and you want one contract that carries the risk, CM-at-risk. Either way, the goal is the same — the owner doesn't get surprised at the milestone meetings.