01 · Renovation & Remodeling

To The Deck.
Not Just The Surface.

Kitchens, baths, additions, whole-home renovations, historic restoration. If the framing is wrong, the framing gets fixed before the finish goes on.

01 / Kitchens

Kitchen Renovations.

From pull-and-replace cabinet swaps to full layout reconfigurations — load-bearing walls opened, plumbing rerouted, electrical sub-panels added for induction or double ovens. Permits pulled when the work calls for them. We coordinate cabinetry leads with our schedule so demo doesn't outrun delivery.

PermitsPulled when structural / plumbing / electrical
Typical timeline6–12 weeks installed
Lead timesCabinetry tracked from order date
02 / Bathrooms

Bathroom Renovations.

Master baths, guest baths, powder rooms. Tile from substrate up — we do the waterproofing properly (Schluter, RedGard, or whichever system the tile setter prefers), not a coat of paint on greenboard. Tub-to-shower conversions, walk-in shower builds with curbed or curbless drains, custom vanity installs.

WaterproofingMembrane systems, not paint-on
Typical timeline3–6 weeks installed
PlumbingCoordinated with permit if relocating
03 / Additions

Additions.

Bump-outs, full-room additions, second-story adds, garage-to-living conversions. Architect-led when one's on the project; we coordinate with engineers for footing design and load calcs when an addition ties into existing structure. Footing inspections scheduled, framing inspections scheduled, final inspections scheduled.

EngineeringStamped when code requires
Typical timeline12–24 weeks
ArchitectWe bring one in if you don't have one
04 / Whole-Home

Whole-Home Renovations.

Top-to-bottom rebuilds of existing homes. Often a full mechanical refresh — new electrical service, repiped supply lines, new HVAC. Layouts opened up where structure allows; structure reinforced where it doesn't. Owners typically vacate; we run a single open project rather than a series of micro-renos.

ScopeStructural, mechanical, finish — all in one project
Typical timeline4–9 months
Living arrangementOwners typically off-site
05 / Historic Restoration

Historic Restoration.

Older Pittsburgh homes with bones worth saving — original trim, original floors, original detail work preserved where it can be, replicated where it can't. We work with the local historic-review processes when properties are in a designated district.

ApproachPreserve first, replicate second
District reviewCoordinated when applicable
Trade overlapSpecialty subs (plaster, millwork)
Process

From Call To Complete.

01
Walkthrough

On-site walkthrough.

Scope discussed, conditions photographed.

02
Scope & Budget

Itemized proposal.

Materials, labor, timeline, allowances.

03
Permits & Schedule

Permits, start set.

Materials ordered, inspections lined up.

04
Build

Crew on-site.

Daily progress, daily cleanup. Punch-list walk.