02 · Residential New Construction

From The
Hole Up.

Custom residential builds, ground-up. Architect-led when one's on the project; we'll bring an architect in when one's not. Site, foundation, frame, finish.

01 / Site & Foundation

Site Work, Excavation, Foundation.

Clearing, grading, utility connections. Footing layout, footing inspections, foundation pour or block depending on the spec. Waterproofing on the exterior face, perimeter drain installed before backfill. We're not the excavator on most jobs — the excavator is our long-time sub. Same with the concrete crew.

SubsLong-time excavator + concrete crew
WaterproofingExterior + perimeter drain
InspectionsFooting, foundation, before backfill
02 / Framing & Shell

Framing, Sheathing, Dry-In.

Stick-built framing per the engineered drawings. Sheathed and house-wrapped. Roof on, windows in, exterior doors hung — the house gets dried in before any interior trade comes on site. Framing inspection scheduled at the right point; nothing gets covered before inspection.

MethodStick-built
Dry-in milestoneRoof + windows + doors
InspectionsFraming before cover
03 / Mechanicals

Electrical, Plumbing, HVAC.

Rough-in coordinated so the trades aren't in each other's way. Service size and panel layout match the spec, not a default. Plumbing supply and DWV laid out for the actual fixture plan. HVAC sized by manual J, not by square footage rule of thumb — especially on tighter builds where the load is genuinely smaller.

SizingManual J for HVAC
Rough-inSequenced, not concurrent
InspectionsEach rough before insulation
04 / Insulation & Drywall

Envelope, Insulation, Board.

Air sealing before insulation — mudded penetrations, gasketed top plates, sealed rim joists. Insulation per the design (batts, blown cellulose, or spray foam depending on assembly). Drywall hung, taped, three coats. Texture or smooth depending on spec.

Air sealingBefore insulation, no exceptions
InsulationPer assembly: batts / cellulose / foam
DrywallThree-coat tape, level 4 default
05 / Finishes & Close-out

Trim, Tile, Cabinet, Paint, Punch.

Finish carpentry, tile, cabinetry, paint — same sub stack we use on renovations, so the trades know our standards. Punch-list walkthrough before final inspection. We don't ask for the final payment until the punch list is closed.

Sub stackSame as renovation work
Punch-listClosed before final payment
Final inspectionCoordinated with township
Process

From Lot To Final.

01
Site & Plans

Walk the lot, review plans.

Architect, engineer, township coordination.

02
Budget & Schedule

Hard numbers, hard dates.

Itemized GMP or cost-plus, schedule baseline.

03
Permits & Subs

Permits pulled, subs locked.

Inspections lined up, lead times tracked.

04
Build & Close

Build through to punch.

Weekly owner updates. Final walk pre-CO.